Some heavy engineering was required to complete the circuit. Around 2m of land was reclaimed around the lake edge to accomodate the line. 'No. 1' is seen here near Wharfside.
Added on 19th January 2005, has been viewed 1005 times
© 2009 D. Ferreira, P. Scott, C. Peake - As Indicated - All rights reserved.